Skip to main content
Loading…
Article VIII. Publication of Users in Significant Noncompliance
This article is included in your selections.
This section is included in your selections.

A. The director shall publish annually, in a newspaper of general circulation that provides meaningful public notice within the jurisdictions served by the POTW, a list of the IUs which, at any time during the previous twelve months, were in significant noncompliance with applicable pretreatment standards and requirements. The term significant noncompliance shall be applicable to all SIUs (or any other IU that violates subsection (A)(3), (4) or (8) of this section) and shall mean:

1. Chronic violations of wastewater discharge limits, defined here as those in which sixty-six percent or more of all the measurements taken for the same pollutant parameter taken during a six-month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits as defined by 40 CFR 403.3(1);

2. Technical review criteria (TRC) violations, defined here as those in which thirty-three percent or more of all of the measurements taken for the same pollutant parameter during a six-month period equal or exceed the product of the numeric pretreatment standard or requirement including instantaneous limits, as defined by 40 CFR 403.3(1) multiplied by the applicable TRC (TRC equals 1.4 for BOD, TSS, fats, oil and grease, and 1.2 for all other pollutants except pH);

3. Any violation of a pretreatment effluent limit (daily maximum or longer term average) that the city determines has caused, alone or in combination with other discharges, interference or pass-through (including endangering the health of POTW personnel or the general public);

4. Any discharge of a pollutant that has caused imminent endangerment to human health, welfare or to the environment or has resulted in the POTW’s exercise of its emergency authority as stated in this chapter to halt or prevent such a discharge;

5. Failure to meet, within ninety days after schedule date, a compliance schedule milestone contained in a local control mechanism or enforcement order for starting construction, completing construction, or attaining final compliance;

6. Failure to provide, within thirty days after the due date, required reports such as baseline monitoring reports, ninety-day compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules;

7. Failure to accurately report noncompliance;

8. Any other violation or group of violations which the city determines will adversely affect the operation or implementation of the local pretreatment program. (Ord. 1598 § 1 (part), 2014)